McInnis Cement Oak Point Terminal
In 2018, McInnis Cement celebrated the opening of their new 100,000-square-foot cement terminal in the Bronx.
AKRF provided environmental, planning, permitting, and civil engineering services for the new facility, which includes a 650-foot dock and three loading silos. Our work included site assessment/remediation services, preparation of the SEQRA Environmental Assessment, and Stormwater Pollution Prevention Plan inspections.
AKRF continued to ensure permitting and regulatory compliance with construction and operation requirements. Oak Point Terminal was the first project to receive Waterfront Edge Design Guidelines (WEDG) Certification from The Waterfront Alliance.
Featured Team Members
Michelle Lapin, PE
Senior Vice President, Site Assessment and Remediation
Linh Do
Senior Vice President, Environmental and Land Use Planning
Sue McCoy, PE
Senior Vice President, Civil Engineering
Sandy Collins
Senior Vice President, Natural Resources and Permitting
Marissa Tarallo, PE, PTOE
Senior Vice President, Traffic and Transportation